1. 00-1_REP Client_Strategic_Brief_Template
2. 00-2_ADM Project_Definition_Objectives_Sheet
3. 00-4_ADM Budget_Viability_Assessment_Template
4. 00-6_ADM Roles_Responsibilities_Summary
5. 00-8_REP Client_Brief_Signoff_Sheet
6. 00-10_CHK_Internal_Fee_Proposal_Checklist
7. 01-1_REP Final_Project_Brief_Template
8. 01-2-1_QA Stakeholder_Statutory_Requirements_Log
9. 01-3_ADM QA_Objectives_Strategy_Sheet
10. 01-9_SIGN Client_Signoff_Form_Stage_1
11. 02-6_SIGN Client_Signoff_Concept_Design
12. 02-10-2_EQ Equality_Impact_Checklist
13. 02-12-1_MAG Design_Meeting_Agenda
14. 02-12-2_MIN Design_Meeting_Minutes
15. 02-13_DRR Information_Register_and_Issue_Sheet
16. 02-8-3_FIRE Fire_Strategy_Responsibility_Matrix
17. 03-2_QA Design_Tolerances_Material_Spec_Tracker
18. 04-02_RLOG Design_Freeze_Declaration_Revision_Log
19. 04-05_ADM Planning_Conditions_Tracker
20. 04-06_QA RFI_Register_Template
21. 04-15_QA Building_Control_Conditions_Tracker
22. 05-1_QA Construction_Site_Inspection_Log
23. 05-2_QA Technical_Query_RFI_Tracker
24. 05-11_QA Snagging_Defect_Log
LEGEND:IMS – Information Management Strategy
High-level project info management approach (ISO 19650-1).NPG – Naming Protocols Guide
File naming & metadata conventions (ISO 19650-2 Cl.5.1).BEP – BIM Execution Plan
Pre-/Post-contract BIM management, roles, deliverables (ISO 19650-2 Cl.5.3).MIDP – Master Information Delivery Plan
Consolidated delivery plan across all task teams (ISO 19650-2 Cl.5.4).TIDP – Task Information Delivery Plan
Per-task-team deliverables plan (ISO 19650-2 Cl.5.4).CDE – Common Data Environment
Workflow & logs for WIP/Shared/Published/Archive (ISO 19650-2 Cl.5.6).DRR – Drawing Register
Design and as-built registers (handover readiness) (ISO 19650-2 Cl.5.7).RLOG – Revision Log
Design freeze & change history (ISO 19650-2 Cl.5.4).GTR – Golden Thread Record
Ongoing safety-critical information log (delivery phase).GTH – Golden Thread Handover
Final golden thread at handover/operations (ISO 19650-3).IFC – Industry Foundation Classes
Interoperable model exchange/review artifacts.BSA – Building Safety Act
Gateway submissions, safety case, PD compliance.REP – Report / Brief
Stage reports, briefs, narrative docs.MIN – Meeting Minutes
Coordination and handover meeting minutes.MAG – Meeting Agenda
Agenda issued before the meeting.SIGN – Sign-offs / Approvals
Client or formal approvals.CHK – Checklists (General)
Generic checklists not covered by other categories.QA – Quality Assurance
Logs, trackers, audits, reviews (non-CDE-specific).FIRE – Fire Safety
Fire strategies, statements, inspections.SUST – Sustainability
BREEAM/Net Zero strategies, logs, reviews.EQ – Equality & Accessibility
Equality Impact Assessments.RISK – Risk Management
Design/project risk registers & matrices.ADM – Administration
Roles/responsibilities, plans, admin & business docs.