BSA Pack (25 documents)

£499.00

Building Safety Act (BSA) Compliance Pack

The DraftCheck BSA Compliance Pack provides 25 ready-to-use templates designed to help architectural practices, lead designers, and project managers meet the stringent requirements of the Building Safety Act 2022 and related regulations.

Covering everything from Gateway submissions to competence assessments, fire safety strategy, Golden Thread record-keeping, and handover documentation, this pack ensures your projects remain fully compliant at every RIBA stage.

With structured checklists, trackers, and compliance forms, the BSA Pack gives your team:

  • Confidence in meeting legal obligations

  • Efficiency through standardised documentation

  • Risk reduction by ensuring nothing is missed before key submission points

Whether you’re handling a single project or multiple complex developments, this pack provides a cost-effective, time-saving solution to achieve BSA compliance with minimal admin burden.

Building Safety Act (BSA) Compliance Pack

The DraftCheck BSA Compliance Pack provides 25 ready-to-use templates designed to help architectural practices, lead designers, and project managers meet the stringent requirements of the Building Safety Act 2022 and related regulations.

Covering everything from Gateway submissions to competence assessments, fire safety strategy, Golden Thread record-keeping, and handover documentation, this pack ensures your projects remain fully compliant at every RIBA stage.

With structured checklists, trackers, and compliance forms, the BSA Pack gives your team:

  • Confidence in meeting legal obligations

  • Efficiency through standardised documentation

  • Risk reduction by ensuring nothing is missed before key submission points

Whether you’re handling a single project or multiple complex developments, this pack provides a cost-effective, time-saving solution to achieve BSA compliance with minimal admin burden.

Documents List:

  1. 00-5-1_BSA BSA_Gateway_Applicability_Checklist

  2. 00-5-2_BSA BSA_Gateway_Applicability_Guideline

  3. 01-4_ADM BSA_Competence_Assessment_Form

  4. 01-6_FIRE Fire_Strategy_Outline_Report

  5. 01-8_BSA Gateway_1_Submission_Checklist

  6. 02-8-1_FIRE Fire_Review_Checklist

  7. 02-8-2_FIRE Gateway1_Fire_Statement_Template

  8. 02-8-3_FIRE Fire Strategy Responsibility Matrix

  9. 03-5-1_FIRE Fire_Safety_Strategy_Report

  10. 03-5-2_FIRE Fire_Safety_Strategy_Checklist

  11. 03-6_BSA Gateway2_Submission_Checklist

  12. 03-7_QA Building_Control_Compliance_Tracker

  13. 03-14_BSA_BSA Design Check Checklist

  14. 04-02_RLOG Design_Freeze_Declaration_Revision_Log

  15. 04-03_BSA Gateway2_Submission_Cover_Sheet

  16. 04-04_BSA Gateway2_Submission_Tracker

  17. 04-07_BSA Principal_Designer_Compliance_Statement

  18. 05-6_GTR Golden_Thread_Record_Update_Log

  19. 05-7_BSA Gateway3_Evidence_Pack_Tracker

  20. 05-12_ADM Photographic_Evidence_Sheet

  21. 06-3_BSA Building_Safety_Case_Submission_Checklist

  22. 06-4_FIRE OM_Manual_Digital_Fire_File_Tracker

  23. 06-5_BSA PostGateway3_Occupation_Approval_Log

  24. 07-2_QA Lessons_Learned_Log

  25. 07-3_GTH Golden_Thread_Handover_Record

LEGEND:
IMS – Information Management Strategy
High-level project info management approach (ISO 19650-1).
NPG – Naming Protocols Guide
File naming & metadata conventions (ISO 19650-2 Cl.5.1).
BEP – BIM Execution Plan
Pre-/Post-contract BIM management, roles, deliverables (ISO 19650-2 Cl.5.3).
MIDP – Master Information Delivery Plan
Consolidated delivery plan across all task teams (ISO 19650-2 Cl.5.4).
TIDP – Task Information Delivery Plan
Per-task-team deliverables plan (ISO 19650-2 Cl.5.4).
CDE – Common Data Environment
Workflow & logs for WIP/Shared/Published/Archive (ISO 19650-2 Cl.5.6).
DRR – Drawing Register
Design and as-built registers (handover readiness) (ISO 19650-2 Cl.5.7).
RLOG – Revision Log
Design freeze & change history (ISO 19650-2 Cl.5.4).
GTR – Golden Thread Record
Ongoing safety-critical information log (delivery phase).
GTH – Golden Thread Handover
Final golden thread at handover/operations (ISO 19650-3).
IFC – Industry Foundation Classes
Interoperable model exchange/review artifacts.
BSA – Building Safety Act
Gateway submissions, safety case, PD compliance.
REP – Report / Brief
Stage reports, briefs, narrative docs.
MIN – Meeting Minutes
Coordination and handover meeting minutes.
MAG – Meeting Agenda
Agenda issued before the meeting.
SIGN – Sign-offs / Approvals
Client or formal approvals.
CHK – Checklists (General)
Generic checklists not covered by other categories.
QA – Quality Assurance
Logs, trackers, audits, reviews (non-CDE-specific).
FIRE – Fire Safety
Fire strategies, statements, inspections.
SUST – Sustainability
BREEAM/Net Zero strategies, logs, reviews.
EQ – Equality & Accessibility
Equality Impact Assessments.
RISK – Risk Management
Design/project risk registers & matrices.
ADM – Administration
Roles/responsibilities, plans, admin & business docs.