PREMIUM - Complete Pack (110 documents)

£1,499.00

Premium Pack – Complete QA & Risk Management Suite

  • 110 templates covering every RIBA stage, BSA Gateway reviews, BIM execution, sustainability, risk registers, and full project handover documentation.

  • Designed for larger practices or firms wanting full QA traceability, compliance assurance, and risk reduction.

  • Value: A single investment that creates a comprehensive QA system, saving time, reducing errors, and improving long-term efficiency across all projects.

Best for: Full-service delivery, HRB/regulated projects, and teams needing robust audit trails through handover and in-use.

What it covers: End-to-end QA with BSA/Golden Thread, advanced BIM deliverables, and complete close-out/aftercare. It’s built for smooth regulator interactions and confident client handovers.

Typical documents include: RIBA Stage Checklists (0–7), QA Review Forms (Concept/Technical Design), Fire Strategy Outline & Gateway 1 Fire Statement, BSA Competence Assessment, Gateway 1/2/3 Submission Checklists & Trackers, IFC Package Review, Information Release Schedule (IRS) & TIDP, Clash Detection Log, Sustainability Compliance Review & Performance Log, Photographic Evidence Sheet, Site Inspection Checklist, Golden Thread Record Update Log, Building Safety Case Submission Checklist, Post-Gateway Occupation Approval Log, Record Drawing Upload Log, Handover Meeting Minutes, Post-Occupancy Review, Lessons Learned Log, Golden Thread Handover Record, QA Close-Out Knowledge Sharing, Digital Safety Case Review.

Premium Pack – Complete QA & Risk Management Suite

  • 110 templates covering every RIBA stage, BSA Gateway reviews, BIM execution, sustainability, risk registers, and full project handover documentation.

  • Designed for larger practices or firms wanting full QA traceability, compliance assurance, and risk reduction.

  • Value: A single investment that creates a comprehensive QA system, saving time, reducing errors, and improving long-term efficiency across all projects.

Best for: Full-service delivery, HRB/regulated projects, and teams needing robust audit trails through handover and in-use.

What it covers: End-to-end QA with BSA/Golden Thread, advanced BIM deliverables, and complete close-out/aftercare. It’s built for smooth regulator interactions and confident client handovers.

Typical documents include: RIBA Stage Checklists (0–7), QA Review Forms (Concept/Technical Design), Fire Strategy Outline & Gateway 1 Fire Statement, BSA Competence Assessment, Gateway 1/2/3 Submission Checklists & Trackers, IFC Package Review, Information Release Schedule (IRS) & TIDP, Clash Detection Log, Sustainability Compliance Review & Performance Log, Photographic Evidence Sheet, Site Inspection Checklist, Golden Thread Record Update Log, Building Safety Case Submission Checklist, Post-Gateway Occupation Approval Log, Record Drawing Upload Log, Handover Meeting Minutes, Post-Occupancy Review, Lessons Learned Log, Golden Thread Handover Record, QA Close-Out Knowledge Sharing, Digital Safety Case Review.

  1. 00-0_CHK_RIBA_Stage_0_Checklist

  2. 00-1_REP_Client_Strategic_Brief_Template

  3. 00-2_ADM_Project_Definition_Objectives_Sheet

  4. 00-3_RISK_Initial_Risk_Register_Template

  5. 00-4_ADM_Budget_Viability_Assessment_Template

  6. 00-5-1_BSA_BSA_Gateway_Applicability_Checklist

  7. 00-5-2_BSA_BSA_Gateway_Applicability_Guideline

  8. 00-6_ADM_Roles_Responsibilities_Summary

  9. 00-7_IMS_Information_Management_Strategy_Template

  10. 00-8_REP_Client_Brief_Signoff_Sheet

  11. 00-9_ADM_RIBA_Stage_0_QA_Review_Form

  12. 00-10_CHK_Internal_Fee_Proposal_Checklist

  13. 00-11_SUST_Sustainability_Drivers_Log

  14. 00-12-1_ADM_Stakeholder_Engagement_Plan_Generic

  15. 01-0_CHK_RIBA_Stage_1_Checklist

  16. 01-1_REP_Final_Project_Brief_Template

  17. 01-2-1_QA_Stakeholder_Statutory_Requirements_Log

  18. 01-2-2_ADM_Stakeholder_Engagement_Plan

  19. 01-3_ADM_QA_Objectives_Strategy_Sheet

  20. 01-4_ADM_BSA_Competence_Assessment_Form

  21. 01-5-1_NPG_Information_Protocols_Naming_Guide

  22. 01-5-2_NPG_Information_Protocols_Naming_Checklist

  23. 01-6_FIRE_Fire_Strategy_Outline_Report

  24. 01-8_BSA_Gateway_1_Submission_Checklist

  25. 01-9_SIGN_Client_Signoff_Form_Stage_1

  26. 01-10_BEP_BIM_Execution_Plan_Template

  27. 01-11_EQ_Equality_Impact_Assessment_Template

  28. 01-12-1_SUST_Sustainability_Objectives_Tracker

  29. 01-12-2_SUST_Sustainability_Objectives_Checklist

  30. 01-13_RISK_Project_Risk_Register

  31. 02-0_CHK_RIBA_Stage_2_Checklist

  32. 02-1_ADM_Concept_Design_QA_Review_Form

  33. 02-2_RISK_Design_Risk_Register

  34. 02-3_RISK_Planning_Risk_Checklist

  35. 02-4_QA_PreApp_Submission_Tracker

  36. 02-6_SIGN_Client_Signoff_Concept_Design

  37. 02-7_BEP_BIM_Execution_Plan_Template

  38. 02-8-1_FIRE_Fire_Review_Checklist

  39. 02-8-2_FIRE_Gateway1_Fire_Statement_Template

  40. 02-8-3_FIRE_Fire_Strategy_Responsibility_Matrix

  41. 02-9_CDE_CDE_Version_Control_Log

  42. 02-10-1_EQ_Equality_Impact_Assessment

  43. 02-10-2_EQ_Equality_Impact_Checklist

  44. 02-11_SUST_Sustainability_BREEAM_Strategy

  45. 02-12-1_MAG_Design_Meeting_Agenda

  46. 02-12-2_MIN_Design_Meeting_Minutes

  47. 02-13_DRR_Information_Register_and_Issue_Sheet

  48. 02-14_CHK_Stage2_Deliverables_Checklist

  49. 02-15_REP_Stage_2_Report_Template

  50. 03-0_CHK_RIBA_Stage_3_Checklist

  51. 03-1_QA_MultiDiscipline_Design_Review_Log

  52. 03-2_QA_Design_Tolerances_Material_Spec_Tracker

  53. 03-3_ADM_Planning_Compliance_Tracker

  54. 03-4_RISK_Design_Risk_Register

  55. 03-5-1_FIRE_Fire_Safety_Strategy_Report

  56. 03-5-2_FIRE_Fire_Safety_Strategy_Checklist

  57. 03-6_BSA_Gateway2_Submission_Checklist

  58. 03-7_QA_Building_Control_Compliance_Tracker

  59. 03-8_BEP_BIM_Execution_Plan_Review_Form

  60. 03-9_EQ_Equality_Impact_Assessment

  61. 03-10_SUST_Sustainability_Compliance_Review

  62. 03-11_REP_Pre-app_Report_Template

  63. 03-12_REP_Stage_3_Report_Template

  64. 03-13_RISK_Designers_Risk_Assesment

  65. 04-0_CHK_RIBA_Stage_4_Checklist

  66. 04-01_ADM_Technical_Design_QA_Review_Form

  67. 04-02_RLOG_Design_Freeze_Declaration_Revision_Log

  68. 04-03_BSA_Gateway2_Submission_Cover_Sheet

  69. 04-04_BSA_Gateway2_Submission_Tracker

  70. 04-05_ADM_Planning_Conditions_Tracker

  71. 04-06_QA_RFI_Register_Template

  72. 04-07_BSA_Principal_Designer_Compliance_Statement

  73. 04-08_BEP_BIM_Execution_Plan_Review_Final

  74. 04-09_EQ_Equality_Impact_Assessment

  75. 04-10_SUST_Sustainability_Compliance_Review

  76. 04-11-1_MAG_Coordination_Meeting_Agenda

  77. 04-11-2_MIN_Coordination_Meeting_Minutes

  78. 04-12_QA_Clash_Detection_Log

  79. 04-15_QA_Building_Control_Conditions_Tracker

  80. 04-16_IFC_IFC_Package_Review_Checklist

  81. 04-17_ADM_IRS_Information_Release_Schedule

  82. 04-18_ADM_TIDP_Task_Information_Delivery_Plan

  83. 05-0_CHK_RIBA_Stage_5_Checklist

  84. 05-1_QA_Construction_Site_Inspection_Log

  85. 05-2_QA_Technical_Query_RFI_Tracker

  86. 05-6_GTR_Golden_Thread_Record_Update_Log

  87. 05-7_BSA_Gateway3_Evidence_Pack_Tracker

  88. 05-8_BEP_BIM_Execution_Plan_Review_Construction

  89. 05-10_SUST_Sustainability_Performance_Log

  90. 05-11_QA_Snagging_Defect_Log

  91. 05-12_ADM_Photographic_Evidence_Sheet

  92. 05-13_CHK_Site_Inspection_Checklist

  93. 06-0_CHK_RIBA_Stage_6_Checklist

  94. 06-1_SIGN_Client_Handover_Signoff_Form

  95. 06-2_DRR_Record_Drawing_Upload_Log

  96. 06-3_BSA_Building_Safety_Case_Submission_Checklist

  97. 06-4_FIRE_OM_Manual_Digital_Fire_File_Tracker

  98. 06-5_BSA_PostGateway3_Occupation_Approval_Log

  99. 06-6_QA_Defects_Snagging_Tracker

  100. 06-7_BEP_BIM_Execution_Plan_CloseOut_Form

  101. 06-9_SUST_Sustainability_Handover_Statement

  102. 06-10_CHK_Soft_Landings_Handover_Checklist

  103. 06-11_QA_Client_Training_Log

  104. 06-12_MIN_Handover_Meeting_Minutes

  105. 07-0_CHK_RIBA_Stage_7_Checklist

  106. 07-1_CHK_PostOccupancy_Review_Checklist

  107. 07-2_QA_Lessons_Learned_Log

  108. 07-3_GTH_Golden_Thread_Handover_Record

  109. 07-4_ADM_QA_CloseOut_Knowledge_Sharing

  110. 07-5_ADM_Digital_Safety_Case_Review

LEGEND:
IMS – Information Management Strategy
 High-level project info management approach (ISO 19650-1).
NPG – Naming Protocols Guide
 File naming & metadata conventions (ISO 19650-2 Cl.5.1).
BEP – BIM Execution Plan
 Pre-/Post-contract BIM management, roles, deliverables (ISO 19650-2 Cl.5.3).
MIDP – Master Information Delivery Plan
 Consolidated delivery plan across all task teams (ISO 19650-2 Cl.5.4).
TIDP – Task Information Delivery Plan
 Per-task-team deliverables plan (ISO 19650-2 Cl.5.4).
CDE – Common Data Environment
 Workflow & logs for WIP/Shared/Published/Archive (ISO 19650-2 Cl.5.6).
DRR – Drawing Register
 Design and as-built registers (handover readiness) (ISO 19650-2 Cl.5.7).
RLOG – Revision Log
 Design freeze & change history (ISO 19650-2 Cl.5.4).
GTR – Golden Thread Record
 Ongoing safety-critical information log (delivery phase).
GTH – Golden Thread Handover
 Final golden thread at handover/operations (ISO 19650-3).
IFC – Industry Foundation Classes
 Interoperable model exchange/review artifacts.
BSA – Building Safety Act
 Gateway submissions, safety case, PD compliance.
REP – Report / Brief
 Stage reports, briefs, narrative docs.
MIN – Meeting Minutes
 Coordination and handover meeting minutes.
MAG – Meeting Agenda
 Agenda issued before the meeting.
SIGN – Sign-offs / Approvals
 Client or formal approvals.
CHK – Checklists (General)
 Generic checklists not covered by other categories.
QA – Quality Assurance
 Logs, trackers, audits, reviews (non-CDE-specific).
FIRE – Fire Safety
 Fire strategies, statements, inspections.
SUST – Sustainability
 BREEAM/Net Zero strategies, logs, reviews.
EQ – Equality & Accessibility
 Equality Impact Assessments.
RISK – Risk Management
 Design/project risk registers & matrices.
ADM – Administration
 Roles/responsibilities, plans, admin & business docs.