Documents List:
00-0_CHK RIBA Stage 0 Checklist
00-9_ADM RIBA Stage 0 - QA_Review_Form
00-10_CHK Internal_Fee_Proposal_Checklist
01-0_CHK RIBA Stage 1 Checklist
02-0_CHK RIBA Stage 2 Checklist
02-1_ADM Concept_Design_QA_Review_Form
02-10-2_EQ Equality_Impact_Checklist
02-14_CHK Stage2_Deliverables_Checklist
03-0_CHK RIBA Stage 3 Checklist
03-1_QA MultiDiscipline_Design_Review_Log
03-2_QA Design_Tolerances_&_Material_Specification_Tracker
03-7_QA Building_Control_Compliance_Tracker
03-5-2_FIRE Fire_Safety_Strategy_Checklist
03-10_SUST Sustainability_Compliance_Review
03-14_BSA BSA Design Check Checklist
04-0_CHK RIBA Stage 4 Checklist
04-01_ADM Technical_Design_QA_Review_Form
04-9_EQ Equality_Impact_Assessment
04-16_IFC IFC_Package_Review_Checklist
05-0_CHK RIBA Stage 5 Checklist
06-0_CHK RIBA Stage 6 Checklist
07-0_CHK RIBA Stage 7 Checklist
LEGEND:IMS – Information Management Strategy
High-level project info management approach (ISO 19650-1).NPG – Naming Protocols Guide
File naming & metadata conventions (ISO 19650-2 Cl.5.1).BEP – BIM Execution Plan
Pre-/Post-contract BIM management, roles, deliverables (ISO 19650-2 Cl.5.3).MIDP – Master Information Delivery Plan
Consolidated delivery plan across all task teams (ISO 19650-2 Cl.5.4).TIDP – Task Information Delivery Plan
Per-task-team deliverables plan (ISO 19650-2 Cl.5.4).CDE – Common Data Environment
Workflow & logs for WIP/Shared/Published/Archive (ISO 19650-2 Cl.5.6).DRR – Drawing Register
Design and as-built registers (handover readiness) (ISO 19650-2 Cl.5.7).RLOG – Revision Log
Design freeze & change history (ISO 19650-2 Cl.5.4).GTR – Golden Thread Record
Ongoing safety-critical information log (delivery phase).GTH – Golden Thread Handover
Final golden thread at handover/operations (ISO 19650-3).IFC – Industry Foundation Classes
Interoperable model exchange/review artifacts.BSA – Building Safety Act
Gateway submissions, safety case, PD compliance.REP – Report / Brief
Stage reports, briefs, narrative docs.MIN – Meeting Minutes
Coordination and handover meeting minutes.MAG – Meeting Agenda
Agenda issued before the meeting.SIGN – Sign-offs / Approvals
Client or formal approvals.CHK – Checklists (General)
Generic checklists not covered by other categories.QA – Quality Assurance
Logs, trackers, audits, reviews (non-CDE-specific).FIRE – Fire Safety
Fire strategies, statements, inspections.SUST – Sustainability
BREEAM/Net Zero strategies, logs, reviews.EQ – Equality & Accessibility
Equality Impact Assessments.RISK – Risk Management
Design/project risk registers & matrices.ADM – Administration
Roles/responsibilities, plans, admin & business docs.